This 4,000 sf pre-engineered, steel communication training building was located on a slab, built with 4 ft masonry block and topped with a peaked metal seamed roof. The building require completion of all utilities, HVAC, fire detections and LAN Drops; two office / storage areas, a classroom with dividers, and latrines for men and women; and three concrete slabs with two having power and grounding systems to facilitate contingency equipment setup.
Cost
$727,000
Duration
September 2005
to
May 2007
Project Type
General Construction
Square Footage
4,300