PERRIS, CA
Design, procure, and build ballasted 388 KWDC rooftop Photovoltaic system consisting of:
864- Talesun TD6I72M-450 Modules
3- Ginlong Tech Solis 100k-5G-US Inverters
Panel Claw Racking
AlsoEnergy Data Acquisition System (DAS)
1 – 600A, 480Y/277V, 4W, NEMA 3R Solarpanel Board
1 – 600A, 600V, 3P, 3W, NEMA 1 AC ULD Disconnect
Stronghold self-performed 100% of this project. Existing building is a concrete tilt up with Johns Manville built-up roofing mineral cap roof. PV racking system was ballasted to maintain roof integrity and manufacturer warranties. The added solar to the building will reduce the customers dependency on the grid for its electrical needs. By providing their own clean energy through renewables the customer is also reducing their carbon footprint. The PV system was designed to offset as much of the customers electrical needs while still taking into account their current billing to maximize savings and ROI with the PPA.