Projects

SIERRA COLLEGE Infrastructure Upgrade

Sierra College

Rocklin, California

The work on this infrastructure upgrade project at the Sierra College Campus includes installing a 12KV electrical loop around the campus. Stronghold will also be installing new fire protection, water and irrigation, a new sanitary sewer line and manholes, IT communication infrastructure, and a new IT building. In order to install the underground infrastructure, Stronghold is demolishing existing concrete and asphalt while also ensuring safe paths of travel for pedestrians while construction is ongoing.

Because the campus was built in 1939, Stronghold is locating all unknown utilities with ground penetrating radar. Our team is self-performing all work including electrical for this project.